Elite Family Residence — 1. Plumbing. Heating system is being tested. 2. Installation of ceramic granite tiles on the balconies Continued ceramic granite tiling work. 3. Finishing works. - Puttying and painting of units. - Finishing of units, the 5th floor. - Installation of drywall ceilings and walls in bathrooms. - Cladding of stair flights with marble. 4. Facade works. - Installation of decorative elements on the balcony parapets. 5. Electrical installation. 6. Installation of openings for dampers.