Get a Consultation

← All news

Elite Family Residence

Real estatePublished Updated 1 min read0 views
Share:Link copied
Elite Family Residence

Elite Family Residence — 1. Plumbing. Heating system is being tested, on the 2nd floor. 2. Installation of ceramic granite tiles on the balconies Continued ceramic granite tiling work. 3. Finishing works. - Finishing of units, on the 2nd , 4th floors. - Installation of drywall in common areas. - Cladding of stair flights with marble. 4. Facade works. - Plastering of the balconies. - Facade winterization. 5. Electrical installation. Internet cable laying. 6. Installation of the smoke extraction system. Installation of openings for dampers. 7. Cast-in works for the entrance group.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news