Get a Consultation

← All news

Elite Family Residence

Real estatePublished Updated 1 min read0 views
Share:Link copied
Elite Family Residence

Elite Family Residence — The following works are carried out at the object: 1. Laying of porcelain stoneware, units on the 1st residential floor Leveling of the surface and laying of tiles with observance of joints and necessary technologies to ensure the strength and durability of the coating. 2. Stairway Plastering Application of primer, followed by even distribution of plaster mix to level and create desired texture. 3. Plastering of walls, on the 3-4th floors Plastering is done to prepare surfaces for finishing. 4. Facing of staircases with marble Includes preparation of the base, laying of slabs on glue, taking into account markings and joints. 5. Installation of gypsum plasterboard framework in bathrooms

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news