Get a Consultation

← All news

Elite Family Residence

Real estatePublished 1 min read0 views
Share:Link copied
Elite Family Residence

Elite Family Residence — The following works are carried out at the object: 1. Plastering of 5-6 floors and puttying of the 1st floor. On the 5-6 floors plastering of walls is carried out taking into account evenness, on the 1st floor puttying is carried out to prepare surfaces for finishing. Also works are carried out in mocap for visualization and verification of design solutions. 3. Waterproofing of the backyard terrace. 4. Tile calibration. Measuring and fitting of tiles to achieve a perfect match in size and shape to ensure a quality installation. 5. Preparation for screeding the floor of the second penthouse level. The base is leveled, utilities and waterproofing are laid. 6. Plumbing works. Installation of plumbing equipment, including installation of water supply and sewerage. Checking the tightness of connections and functionality of systems to ensure quality water supply. 7. Installation of installations and communications in bathrooms from moisture-resistant gypsum plasterboard sheets.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news