Get a Consultation

← All news

WWyndham Grand Batumi Gonio. Riviera.

Real estatePublished Updated 1 min read0 views
Share:Link copied
WWyndham Grand Batumi Gonio. Riviera.

WWyndham Grand Batumi Gonio. Riviera. — 1. Block C. Concrete pouring of staircases. 2. Block A. Completion of mockup installation. - Utilities system installation, namely: sewage, heating, and water supply. - Inner communication system is being installed. - Electrical installation. 3. Block E. Facade works. Facade plastering. 4. Infrastructure building. - Ceramic blocks installation on the 1st -2nd floors. 5. Block E. Drywall frame installation.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news