Wyndham Grand Batumi Gonio. Aqua.

1. Construction of elevator shafts.
— Installation of elevator equipment, installation of doors.
— Plastering in elevator shafts.

2. finishing works, 20th floor.
Laying boards and skirting boards.

3. Plastering works, 18th floor.
Decorative plastering.

4. Plasterboard frame installation works.
Arrangement of the frame on the balconies, framing of the frame.
5. Infrastructure building.
— Installation of formwork of the floor slab and staircase 2 floor.
— Waterproofing works.