Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua — 1. Diamond drilling for engineering openings. Layout and drilling are underway, necessary for future hotel utility installations. 2. Installation of stained glass. The construction of ledges for stained glass along with the stained glass installation. This ensures light permeability and improves thermal and sound insulation for hotel rooms. 3. Facade work, the 14th -15th floors. This includes the installation of facade elements on balconies. 4. Installation of plumbing and sewage systems. The installation of the sewerage system on the 4th – 5th floors is in progress. The installation of the stormwater drainage system on the 15th – 16th floors is underway. 5. Installation of decorative steel columns, the 10th floor. The columns are being fabricated and installed. The installation of drywall frames for interior partitions is ongoing on the 3rd, 12th, 15th, and 17th floors.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news