Wyndham Grand Batumi Gonio. Aqua
1. Facade works.
— Facade winterization, the 3rd, 5th, 7th, 11th floors.
— Plastering of facade walls, the 2nd — 20th floors.
2. Installation of utilities systems.
— Installation of the exhaust ventilation, the 4th -6th floors.
— Wiring, the 17th floor.
— Installation of water supply manifolds, the 4th- 7th floors.
3. Fabrication and installation of steel arches
Balconies on the 10th, 19th — 20th floors.
4. Suspended ceiling installation.
On the balconies, the 3rd — 4th floors.
5. Waterproofing
Balconies of the 20th floor.
6. Drywall frame installation.
On the 19th- — 20th floors.
7. Floor screeding.
On the balconies, the 19th floor.
8. Infrastructure building.
Ongoing excavating.