Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua

1. Facade works.
— Facade winterization, the 5th, 7th, 11th floors.
— Plastering of facade walls, the 2nd — 20th floors.

2. Installation of utilities systems.
— Water supply and sewage systems are being installed on the 9th, 11th- 17th floors.
— Power supply, the 18th floor.
— Installation of the exhaust ventilation, the 4th -5th floors.

3. Fabrication and installation of steel arches
Balconies on the 19th — 20th floors.

4. Suspended ceiling installation.
On the balconies, the 3rd floor.

5. Waterproofing.
Balconies of the 9th floor.

6. Drywall frame installation.
On the 17th — 19th- floors.

7. Floor screeding.
On the balconies, the 3rd, 19th floors.

8. Installation of the elevator.
Installation of elevator shaft beams on the 20th floor.

9. Mockup construction on the 13th floors.
— Wallpapering.
— Installation of balcony railings on the central facade.

10. Infrastructure building.
Ongoing excavating.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news