fbpx

Wyndham Grand Batumi Gonio. Aqua

1. Facade works.
— Facade winterization, the 6th, 7th, 14th, 15th floors.

2. Installation of utilities systems.
— Hot and cold water supply risers are being installed (horizontal layout), the 4th, 5th, 14th, 19th floors.
— Wiring on the balconies, the 20th floor.

3. Diamond core drilling for engineering openings, the 6th floor.
Marking and drilling of precise openings for the installation of utilities in the future hotel.

4. Elevator shafts installation
— Laying of gas silicate blocks, the 12th, 13th floors.

5. Fabrication and installation of steel arches
Balconies on the 19th, 20th floors.

6. Mockup construction on the 13th floor.
— Finishing works.

7. Floor screeding
On the balconies, the 5th — 6th floors.

8. Suspended ceiling installation.
On the balconies, the 2nd floor.

9. Waterproofing
Balconies of the 8th — 9th floors.

10. Drywall frame installation.
On the 3rd, 12th — 14th floors.