Wyndham Grand Batumi Gonio. Aqua

1. Facade works.
— Plastering of the facade.
— Facade insulation.

2. diamond drilling of engineering holes.
For the device of engineering systems.

3. Plasterboard frame installation works.

4. Plastering works.
Plastering of balconies.

5. Floor screeding works.
On the 8th floor.

6. Works on the device mocap, 3 floor.
Priming of walls.

7. Infrastructure building.
— Primer priming of walls.
— Installation of floor slab formwork.