Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua — 1. Facade works, the 3rd, 4th, 7th , 8th floors. This includes the installation of facade elements on balconies. 2. Installation of drywall frames. - Installation of internal partitions. - Cladding of ledges, the 11th –14th floors. 3. Mockup construction on the 3rd, 13th floors. - Painting is in progress on the 3rd floor. 4. Diamond core drilling for engineering openings on the 8th - 10th , 16th ,17th floors. Marking and drilling of precise openings for the installation of utilities in the future hotel. 5. Installation of utilities systems. - Assembling and installation of water supply manifolds, the 6th – 9th floors. - Hot and cold water supply risers are being installed, the 6th -9th floors. - Cladding of the stormwater drainage duct, 11th floor. 6. Waterproofing of the balconies. On the 4th , 7th , 17th floors. 7. Fabrication and installation of steel arches Balconies on the 9th -19th floors. 8. Construction of concrete ledges, 3rd -4th floors Formwork and reinforcement for ledges designed to support stained-glass installations. 9. Floor screeding, the 11th floor. The floor screeding is being installed. 10. Elevator shafts are being installed, the 2nd floor. - Priming of elevator’s shafts 11. Masonry works, the2nd , 20th floors. Ceramic block installation.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news