Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua

Real estatePublished 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Electrical installation, 17th floor.
— Installation of ventilation system, 7.

2. Plasterboard frame installation.
Arrangement of the partition frame, column sealing, ceiling sealing.

3. finishing works, 20th floor.
Laying tiles on the balconies.

4. Plastering works.
Plastering balconies.

5. Arrangement of boards for the installation of stained glass.
Pouring curbs.

6. Works in the workshop.
Manufacturing of details.

7. Infrastructure building.
Reinforcement of walls of the 2nd floor.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news