Wyndham Grand Batumi Gonio. Aqua
1. Installation of Engineering Systems
Electrical installation work, 13th floor.
Installation of the water supply system,
Installation of the ventilation system on the roof.
2. Facade Works
Thermal insulation of balconies, 3rd, 5th, 12th floors.
3. Floor Screed Installation
On balconies,
4. Arch Sheathing
On the 9th,
5. Workshop Works
Manufacturing of embedded parts.
6. Roof Works
Installation of stands.
7. Infrastructure Building
Reinforcement of the floor slab.