Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
Electrical installation work, installation of clips.

2. Installation of elevator shafts.
Installation of elevator equipment.

3. Drilling of engineering holes.
For further installation of engineering networks.

Other construction work on the site is not being carried out today due to weather conditions.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news