Wyndham Grand Batumi Gonio. Aqua.

Wyndham Grand Batumi Gonio. Aqua.

1. Installation of engineering systems.

— Electrical installation work, wiring layout.

— Plumbing work.

— Installation of air conditioning pipes.

2. Installation of plasterboard frame.

Installation of inter-unit partition frames, installation of ceiling frames.

3. Finishing works, 9th floor.

Laying tiles on balconies.

4. Plastering work.

Installation of decorative plaster on balconies.

5. Facade work.

Plastering work.

6. Installation of stained glass structures.

Assembly of stained glass windows.

7. Infrastructure building.

— Dismantling of formwork for vertical structures, 7th floor.

— Laying of ceramic blocks, 3rd floor.