1. Installation of engineering systems.
— Electrical installation works, 18th floor.
— Installation of ventilation system, 15–17 floors.

2. Facade works.
Facade insulation on balconies, 4, 11, 13 floors.

3. Waterproofing works, 4–5 floors.
Work on the second layer of waterproofing on the balconies.

4. Works in the workshop.
Fabrication of embedded parts.

5. Arrangement of columns and partitions of reinforced concrete frame.
Works on 2–9, 11–20 floors.

6. Arrangement of suspended ceilings.
On the 8–9 floor.

7. Installation of gypsum plasterboard frame.
Closing the frame, 19–20 floor.

8. Closing of arches.