Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Electrical installation works, 18th floor.
— Installation of ventilation system, 15–17 floors.

2. Facade works.
Facade insulation on balconies, 4, 11, 13 floors.

3. Waterproofing works, 4–5 floors.
Work on the second layer of waterproofing on the balconies.

4. Works in the workshop.
Fabrication of embedded parts.

5. Arrangement of columns and partitions of reinforced concrete frame.
Works on 2–9, 11–20 floors.

6. Arrangement of suspended ceilings.
On the 8–9 floor.

7. Installation of gypsum plasterboard frame.
Closing the frame, 19–20 floor.

8. Closing of arches.
On the 20th floor.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news