Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua.

Real estatePublished 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua.

Wyndham Grand Batumi Gonio. Aqua.

1. Installation of engineering systems.

— Electrical work.

— Installation of a fire extinguishing system.

— Installation of air conditioning system.

2. Plastering works.

Installation of decorative plaster on balconies.

3. Installation of plasterboard frame.

Installation of frame for inter-unit partitions, covering of frame.

5. Infrastructure building.

— Installation of formwork for vertical structures, 6th floor.

— Laying ceramic blocks, 2nd floor.

6. Workshop work.

Welding work.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news