Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua.

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua.

Wyndham Grand Batumi Gonio. Aqua.

1. Installation of engineering systems.

— Electrical work, installation of clips, laying of electrical cables, 14th floor.

— Installation of fire extinguishing system, 2nd-5th floors.

2. Plastering work.

Installation of decorative plaster on balconies.

3. Installation of plasterboard frame.

— Installation of frame for inter-unit partitions, 15th-16th floors.

— Installation of insulation for inter-unit walls, 16th floor.

4. Finishing works, 9th floor.

Laying tiles on balconies.

5. Installation of balconies for the panoramic elevator.

Reinforcement of balconies.

6. Facade work.

Plastering of the facade.

7. Infrastructure building.

Reinforcement of floor slabs, 5th floor.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news