Wyndham Grand Batumi Gonio. Aqua.
1. Installation of engineering systems.
— Electrical work, installation of clips.
— Plumbing work.
— Installation of air conditioning system.
2. Plastering work.
Installation of decorative plaster on balconies.
3. Installation of plasterboard frame.
Installation of frame for inter-unit partitions, covering of frame.
4. Finishing work, 19th floor.
Laying tiles on balconies.
5. Roof work.
Binding of posts.
6. Infrastructure building.
— Concreting of vertical structures, 6th floor.
— Laying ceramic blocks, 2nd floor.