Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua.

Real estatePublished 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua.

Wyndham Grand Batumi Gonio. Aqua.

1. Installation of engineering systems.

— Electrical work.

— Installation of fire extinguishing system.

— Sealing of ventilation openings.

2. Plastering works.

Installation of decorative plaster on balconies.

3. Ceiling installation works.

Installation of ceiling frames on balconies, covering of frames.

4. Facade work.

Plastering the facade.

5. Infrastructure building.

— Reinforcement of vertical structures, 6th floor.

— Ceramic block masonry, 2nd floor.

6. Welding work.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news