Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua

Real estatePublished 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.

— Electrical work.

— Plumbing work.

2. Plastering work.

Installation of decorative plaster on balconies.

3. Ceiling installation work.

Installation of ceiling frames on balconies, covering of frames.

4. Finishing work, 19th floor.

Laying tiles on balconies.

5. Drilling of engineering holes.

For subsequent installation of engineering systems.

6. Infrastructure building.

— Installation of formwork for floor slabs, 5th floor.

— Laying of ceramic blocks, 1st floor.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news