Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
— Electrical work.
— Plumbing work.
— Installation of a fire extinguishing system.
— Installation of a ventilation system.
2. Facade work.
Facade plastering.
3. Plastering work.
Installation of decorative plaster on balconies.
4. Installation of plasterboard frame.
Cladding of inter-unit partition frames.
5. Drilling of engineering holes.
For subsequent installation of engineering systems.