Wyndham Grand Batumi Gonio. Aqua.
1. Installation of engineering systems.
— Electrical work, wiring.
— Plumbing work, 18th floor.
— Installation of air conditioning pipes, 16th floor.
— Installation of ventilation system, 9th floor.
2. Plastering work.
Installation of decorative plaster on balconies.
3. Installation of plasterboard frame, 16th floor.
Installation of frame for inter-unit partitions, insulation of inter-unit partitions.
4. Installation of panoramic elevator.
Installation and reinforcement of panoramic elevator slabs.
5. Infrastructure building.
— Concreting of floor slabs, 6th floor.
— Laying of ceramic blocks, 2nd floor.