Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua.

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua.

Wyndham Grand Batumi Gonio. Aqua.

1. Installation of engineering systems.

— Electrical work, wiring.

— Plumbing work, 18th floor.

— Installation of air conditioning pipes, 16th floor.

— Installation of ventilation system, 9th floor.

2. Plastering work.

Installation of decorative plaster on balconies.

3. Installation of plasterboard frame, 16th floor.

Installation of frame for inter-unit partitions, insulation of inter-unit partitions.

4. Installation of panoramic elevator.

Installation and reinforcement of panoramic elevator slabs.

5. Infrastructure building.

— Concreting of floor slabs, 6th floor.

— Laying of ceramic blocks, 2nd floor.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news