Wyndham Grand Batumi Gonio. Aqua.
1. Installation of engineering systems.
— Electrical work, wiring.
— Plumbing work.
— Installation of air conditioning pipes.
— Installation of ventilation system.
2. Plastering work.
Installation of decorative plaster on balconies.
3. Installation of plasterboard frames.
Installation of frames for inter-unit partitions, insulation of inter-unit partitions.
4. Finishing works, 9th floor.
Laying tiles on balconies.
5. Infrastructure building.
— Installation of formwork for vertical structures, 7th floor.
— Laying ceramic blocks, 3rd floor.