Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua.

Wyndham Grand Batumi Gonio. Aqua.

Wyndham Grand Batumi Gonio. Aqua.

1. Installation of engineering systems.

— Electrical work, wiring.

— Plumbing work.

— Installation of air conditioning pipes.

— Installation of ventilation system.

2. Plastering work.

Installation of decorative plaster on balconies.

3. Installation of plasterboard frames.

Installation of frames for inter-unit partitions, insulation of inter-unit partitions.

4. Finishing works, 9th floor.

Laying tiles on balconies.

5. Infrastructure building.

— Installation of formwork for vertical structures, 7th floor.

— Laying ceramic blocks, 3rd floor.