Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua.

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua.

Wyndham Grand Batumi Gonio. Aqua.

1. Installation of engineering systems.

— Electrical work, wiring.

— Plumbing work, installation of smart boxes.

— Installation of air conditioning pipes.

2. Installation of plasterboard frame.

Installation of frame for inter-unit partitions, insulation of internal partitions.

3. Finishing work, 9th and 19th floors.

Laying tiles on balconies.

4. Plastering work.

Installation of decorative plaster on balconies.

5. Facade work.

Plastering work.

6. Installation of stained glass structures, 10th floor.

Assembly of stained glass windows.

7. Installation of a panoramic elevator.

8. Infrastructure building.

— Installation of formwork for vertical structures, 7th floor.

— Laying of ceramic blocks, 3rd floor.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news