1. Installation of engineering systems.
— Electricity supply system installation, 16–18 floors.
— Plumbing works, 14–18 floors.

2. Plasterboard frame installation works, 16–17 floors.
Installation of partitions.

3. Works on the device of floor screed.
On the 5th floor.

4. Plastering works.
Plastering on the balconies.

5. Arrangement of mocap, 3rd floor.
Installation of doors.

6. Facade works.
Plastering of the facade.

7. Infrastructure building.
Reinforcement of vertical structures.