Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Electricity supply system installation, 17th floor.
— Plumbing works, 11–18 floors.
— Installation of storm water drainage system.

2. Plastering works.
Plastering on balconies.

3. Facade works.
Plastering of the facade.

4. Works on the roof of the building.
Works on waterproofing.

5. Infrastructure building.
Reinforcement of vertical structures on the 1st floor.