Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Electricity supply system installation, 9th, 19th, 20th floor.
— Plumbing works, 2–9 floors.

2. Facade works.
Plastering of the facade.

3. Diamond drilling of engineering holes.
For the device of engineering systems.

4. Plasterboard frame installation works.
Closure of the frame.

5. Masonry works, 10th floor.
Masonry doorways.

6. Plastering works.
Plastering of balconies.

7. Floor screeding works.
On the 9th floor.