Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Installation of electrical supply system, 11th floor.
— Installation of hot and cold water supply system, 6–7 floors.

2. Facade works.
Plastering of the facade, 6, 8, 15, 19 floors.

3. Floor screed works.
On the 12th floor.

4. finishing works, 2 floor.
Laying ceramic tiles on the balconies.

5. Works on the installation of gypsum plasterboard frame, 12, 16 floors.

6. Arrangement of mocap, 3 floor.
Finishing works.

7. Works on the roof of the building.
— Manufacturing and installation of props.
— Drilling of engineering holes.

8. Works on the device of elevator shafts.
Plastering works.

9. Infrastructure building.
— Reinforcement of walls.
— Installation of formwork.