Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua

Real estatePublished 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Installation of electrical supply system, 20th floor.
— Plumbing works.

2. Diamond drilling of engineering holes, 16th floor.
For the device of engineering systems.

3. Plasterboard frame installation works, 5, 6, 19 floor.
Cladding of the frame.

4. Masonry works, 7–9 floors.
Masonry doorways.

5. Plastering works.
Plastering of balconies.

Other construction works are not carried out at the site due to weather conditions.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news