Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
Installation of electrical system, 11th floor.
2. Facade works.
— Facade insulation on balconies, 12–14 floors.
— Plastering of balconies.
3. Floor screeding works.
On the 14th floor.
4. finishing works, 3 floor.
Laying ceramic tiles on the balconies.
5. Mocap works, 3rd floor.
Finishing works.
6. Plasterboard frame installation works.
7. Installation of suspended ceilings.
On the 9th floor.
8. Works on the roof of the building.
Fabrication and installation of columns and posts.
9. Diamond drilling of engineering holes, roofing.
For the device of communication systems.
7. Infrastructure building.
— Reinforcement of the pool slab.
— Installation of formwork.