Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua

Real estatePublished 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Installation of electrical system, 11th floor.
— Installation of water supply system, 14th to 15th floor.

2. Facade works.
— Facade insulation on balconies, 12–14 floors.
— Plastering of the facade.

3. Floor screed works.
On the 13th floor.

4. finishing works, 2–3 floor.
Laying ceramic tiles on the balconies.

5. Mocap works, 3rd floor.
Finishing works.

6. Plasterboard frame installation works.

7. Works on the roof of the building.
Manufacturing and installation of columns and racks.

8. Works on the device of elevator shafts.
Masonry works.

9. Diamond drilling of engineering holes, roofing.
For the device of communication systems.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news