Wyndham Grand Batumi Gonio. Aqua

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
Installation of electrical system, 16th-17th floor.

2. Facade works.
Facade insulation on balconies, 11th, 13th, 14th floors.

3. Waterproofing works, 2nd floor.
Work on the second layer of waterproofing on the balconies.

4. Works in the workshop.
Fabrication of embedded parts.

5. Arrangement of columns and partitions of reinforced concrete frame.
On 2–9, 11–20 floors.

6. Work on the floor screed.
On the 15th floor.

7. Masonry works.
Masonry block of ventilation shafts.

8. Finishing works, 3rd floor.
Laying of ceramic tiles on the balconies.

9. Diamond drilling of engineering holes.
For the device of communication systems.

10. Infrastructure building.
— Reinforcement of walls.
— Installation of formwork.