Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Installation of electrical system, 17th floor.
— Plumbing works, 11th, 18th floor.
— Installation of storm water drainage system.

2. Plastering works, 2–4 floors.
Plastering on balconies.

3. Facade works.
Plastering of the facade.

4. Works on the roof of the building.
Installation of posts.

5. Works on the floor screed.
On the balconies of the 3rd floor.

6. Works on the device of elevator shafts.
On 1–2 floors.

7. Infrastructure building.
Reinforcement of vertical structures on the 1st floor.