Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Installation of electrical system, 17th floor.
— Plumbing works, 17th floor.
— Installation of storm water drainage system.

2. Plastering works, 2–4, 9 floor.
Plastering on balconies.

3. Facade works.
Plastering of the facade.

4. Works on the roof of the building.
Installation of posts.

5. Works on the floor screed.
On the balconies of the 4th floor.

6. Works on the device of elevator shafts.
On 1–2 floors.

7. Works on the device mocap, 13th floor.

8. Works on the device of gypsum plasterboard frame.
Installation of partitions.

9. Infrastructure building.
Dismantling of vertical structures formwork.