Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
— Installation of electrical system, 19th floor.
— Plumbing works, 20th floor.
2. Plasterboard frame installation works.
Installation of partitions.
3. Works on the device of floor screed.
On the 5th floor.
4. Plastering works.
Plastering on the balconies.
5. Arrangement of mocap, 3rd floor.
Finishing works.
6. Facade works.
Plastering of the facade.
7. Creation of infrastructure.
Strengthening of columns.