Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua

Real estatePublished 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Installation of electrics, 8th floor.
— Installation of plumbing, 8th floor.

2. Installation of elevator shafts.
Installation of elevator equipment.

3. Waterproofing works.
Preparatory work for the application of waterproofing on the roof of the building.

4. Arrangement of gypsum cardboard framework.

5. Finishing works.
Laying tiles on the balconies, 20th floor.

6. Plastering works.
Plastering of balconies.

7. Infrastructure building.
Reinforcement of walls of the 2nd floor.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news