1. Installation of engineering systems.
— Installation of electrics, 8th floor.
— Plumbing installation, 9th floor.
— Installation of ventilation system, 16th floor.

2. Masonry works, 10th floor.
Ceramoblock masonry.

3. Installation of elevator shafts.
Installation of elevator equipment.

4. Waterproofing works.
Preparatory work for the application of waterproofing on the roof of the building.

5. Arrangement of gypsum plasterboard frame.
Closing of the gypsum plasterboard.

6. Finishing works.
Laying tiles on the balconies, 20th floor.

7. Plastering works.
Plastering of balconies.

8. Infrastructure building.
Concreting of the floor slab of the 1st floor.