Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Installation of power supply system, 16–18, 20 floors.
— Installation of ventilation system, 17–18 floors.

2. Facade works.
— Facade insulation on balconies, 4, 11, 13 floors.
— Plastering of the facade.

3. Works in the workshop.
Manufacturing of embedded parts.

4. Installation of gypsum plasterboard frame.
Closing of the frame, 20th floor.

5. Work on the floor screed.
On the 16th floor.

6. Masonry works.
Masonry block of ventilation shafts.

7. Arrangement of mocap, 3rd floor.
Puttying of walls.

8. Diamond drilling of engineering holes.
For the device of communication systems.

9. Infrastructure building.
Reinforcement of walls.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news