Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
— Installation of power supply system, 16–18, 20 floors.
— Installation of ventilation system, 17–18 floors.
2. Facade works.
— Facade insulation on balconies, 4, 11, 13 floors.
— Plastering of the facade.
3. Works in the workshop.
Manufacturing of embedded parts.
4. Installation of gypsum plasterboard frame.
Closing of the frame, 20th floor.
5. Work on the floor screed.
On the 16th floor.
6. Masonry works.
Masonry block of ventilation shafts.
7. Arrangement of mocap, 3rd floor.
Puttying of walls.
8. Diamond drilling of engineering holes.
For the device of communication systems.
9. Infrastructure building.
Reinforcement of walls.