Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
Installation of power supply system, 19th, 20th floor.
2. Diamond drilling of engineering holes, 16th floor.
To install engineering systems.
3. Plasterboard frame installation works.
Closing of the frame.
4. Masonry works, 7–9 floor.
Masonry doorways.
5. Infrastructure building.
— Dismantling of wall formwork.
— Installation of floor slab formwork.