1. Installation of engineering systems.
Installation of power supply system, 20th floor.

2. Facade works.
Plastering of the facade.

3. finishing works, 2, 3 floors.
Laying of ceramic tiles on balconies.

4. Installation of gypsum plasterboard frame.
Installation of drywall frame rails, framing of the frame.

5. Arrangement of mocap, 3rd floor.
Finishing works.

6. Works on the roof of the building.
— Fabrication and welding of posts.
— Drilling of engineering holes.

7. Masonry works, 1st floor.
Ceramoblock masonry.

8. Infrastructure building.
Installation of formwork.