Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
Installation of power supply system, 20th floor.
2. Facade works.
Plastering of the facade.
3. Plastering works.
Plastering of balconies.
4. Work on the roof of the building.
Drilling of engineering holes.
5. Masonry works,
Masonry of doorways.