Get a Consultation

← All news

Wyndham Grand Batumi Gonio. Aqua

Real estatePublished 1 min read1 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Installation of power supply system, 20th floor.
— Installation of water supply system, 2nd floor.

2. Facade works.
— Facade insulation, 8–14 floors.
— Plastering of the facade, 8–14 floors.

3. finishing works, 2, 3 floors.
Laying of ceramic tiles on balconies.

4. Plasterboard frame installation works.
Installation of drywall frame rails, framing of the frame.

5. Arrangement of mocap, 3rd floor.
Puttying of walls.

6. Work on the roof of the building.
— Welding of struts.
— Drilling of engineering holes.

7. Infrastructure building.
— Reinforcement of walls.
— Installation of formwork.

Wyndham Grand Batumi Gonio Editorial

Author

Blog editorial team

We write about the Batumi and Georgia real estate market, hotel room investments and the construction progress of the complex.

All posts by the author →

More news