Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
Installation of storm water drainage system, 5th, 6th floor.
2. Installation of elevator shafts.
Installation of lighting in the shafts.
3. Work on the roof.
Preparatory work for the application of waterproofing.
4. Arrangement of railings on balconies.
Installation of balusters in units on the 2nd floor.