Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
Installation of storm water drainage system, 5th, 6th floor.
No other construction works are being carried out on the site today due to holidays.
1. Installation of engineering systems.
Installation of storm water drainage system, 5th, 6th floor.
No other construction works are being carried out on the site today due to holidays.
Get personal advice from a specialist in branded real estate Wyndham Grand
Thank you for the application!
Within 5 minutes, our expert will contact you and tell you in detail about everything personally.
Get a consultation and gifts with purchases until December 31st