1. Installation of engineering systems.
— Installation of storm water drainage system, 9–11 floors.
— Installation of sewerage, 14–15 floors.
— Electrical installation, 8th, 15th floor.

2. Facade works.
Insulation of the facade, 3–6 floors.

3. Installation of gypsum plasterboard frame, 13–14 floor.
Installation of partitions.

4. Plastering works, 20th floor.
Plastering of balconies.

5. Installation of elevator shafts.
Installation of lighting.

6. Waterproofing works.
On the roof of the building preparatory work for the application of waterproofing.

7. Masonry works, 10th floor.
Ceramoblock masonry.

8. Infrastructure building.
Floor slab formwork on the 2nd floor.