Wyndham Grand Batumi Gonio. Aqua

1. Installation of utilities systems.
— Wiring, the 11th- 16th, 19th floors.
— Installation of water piping, the 5th — 9th, 20th floors.
— Installation of ventilation risers, the 7th — 9th floors.

2. Floor screeding.
On the balconies, the 20th floor.

3.Fabrication and installation of steel arches.
On the balconies, the 19th floor.

4. Installation of suspended ceiling.
Balconies, the 6th floor.

5. Diamond drilling of the engineering openings, the roof.
Marking and drilling is carried out, which is necessary for the installation of engineering systems of the future hotel.

6. Installation of elevator shafts.
Laying of aerated blocks in the shafts.

7. Infrastructure building.
Ongoing pit excavation.