Wyndham Grand Batumi Gonio. Aqua

Real estatePublished Updated 1 min read0 views
Share:Link copied
Wyndham Grand Batumi Gonio. Aqua

Wyndham Grand Batumi Gonio. Aqua

1. Installation of utilities systems.
— Wiring, the 13th — 15th floor.
— Ventilation system installation, the 20th floor.
— Installation of water supply system, the 5th — 9th, 13th — 15th floors.

2. Facade works.
— The facade winterization on the balconies, the 3rd, 5th, 12th, 20th floors.

3. Installation of drywall framing.
— Installation of frame guides for drywall partitions, the 7th — 9th, 18th floors.
— Sheathing of the drywall frame, the 11th floor.

4. Installation of the suspended ceilings.
On the 7th — 8th floors.

5. Workshop.
Fabrication of the embedded parts.

6. Infrastructure building.
Ongoing pit excavation.