Wyndham Grand Batumi Gonio. Aqua

1. Installation of utilities systems.
— Wiring, the 15th, 19th floors.
— Installation of water supply system, piping layout for hot and cold water supply, the 7th-9th floors.
— Ventilation system installation, the 20th floor.

2. Facade works.
The facade winterization on the balconies, the 5th, 14th, 16th, 20th floors.

3. Installation of drywall framing.
— Installation of frame guides for drywall partitions, the 11th- 12th floors
— Sheathing of the drywall frame, the 16th- 17th floors.

4. Floor screeding.
On the balconies and in the units, the 18th floor.

5. Diamond drilling of the engineering openings.
Marking and drilling is carried out, which is necessary for the installation of engineering systems of the future hotel.

6. Roofing.
Installation of embedded parts and supports.

7. Workshop.
Fabrication of the embedded parts.

8. Infrastructure building.
— Ongoing pit excavation.